top of page

Baker Job

  • Writer: StraightLine Construction
    StraightLine Construction
  • Apr 22, 2020
  • 1 min read

Updated: May 29, 2020

Denver, Colorado


  • Project Type: Underpinning & Repair

  • Division: Residential

  • Service: Compaction Grouting


Mini-compaction grouting performed on the sunroom floor.


Before:


1 ¾” holes were drilled through the concrete slab in eight locations and a low-mobility grout was injected at a depth of 6’ below the slab, and grouted from the bottom up.



After:


As seen below, the slab was raised to maximum practical recovery. The holes were patched and the work area was cleaned.



Comentarios


bottom of page